River Way Bridge in Harlow is closed to vehicles from today, 20 November, until further notice after concerns found in checks. People can still walk over it.
River Way Bridge in Harlow is closed to all vehicles from today, Friday 20 November. There is no date for it to reopen.
Essex Highways announced the closure on its X account on Thursday. It said the bridge “will be fully closed to vehicles from tomorrow, 20 Nov 2026 until further notice following concerns identified during recent assessments.” Pedestrian access stays open.
The bridge carries River Way over the railway line. River Way runs off the A414 Edinburgh Way and serves the industrial estates beside the River Stort.
What it means for you
- Driving: you cannot cross the bridge in any vehicle. Essex Highways has not published a diversion route.
- On foot: you can still walk over the bridge.
- The other way in: River Way also has a junction with the A1184 Cambridge Road at its eastern end. Essex Highways built it to give a second road into the Templefields Enterprise Zone and take some traffic off Edinburgh Way.
- Deliveries and staff: if you work on River Way or have goods delivered there, check the route with the business before you set off.
Essex Highways has not said what the assessments found or what work the bridge needs.
A bridge already due for replacement
The bridge’s condition has been on record for some time. In February 2022, Harlow Council’s planning committee considered the plans for the Eastern Stort Crossing, the new road linking Harlow with the Gilston villages. The officers’ report (application HW/CRB/19/00221) said:
“the River Way Bridge over the railway line, which is reaching the end of its serviceable life, is being replaced to, in part, enable a safe connection to be made that meets current highway safety standards.”
The same report said the scheme included “the full replacement of the current River Way road bridge over the railway line”, with wider walking and cycling paths. It also set out walking and cycling improvements along River Way up to the Edinburgh Way junction.
East Herts Council announced in 2022 that the Eastern and Central Stort Crossing applications had been approved. Essex Highways has not said whether today’s closure changes the timing of that replacement.
We will update this story when Essex Highways publishes a diversion or a date for repairs.
Source: Essex Highways on X, 19 November 2026; Harlow Council Development Management Committee report, HW/CRB/19/00221, February 2022; Essex Highways, Cambridge Road access improvements; East Herts Council, 2022.
Have your say