No Liverpool Street closure is listed for Harlow trains this Christmas, unlike last year's eight days. Night diversions run 21 to 23 December. No trains on the 25th.

There will be no trains from Harlow Town or Harlow Mill on Christmas Day. Unlike last year, though, National Rail’s engineering list has no Liverpool Street closure for the Harlow line over Christmas and New Year, as of 5 November. The works it does list are overnight diversions and a Boxing Day Stansted Express that starts at Tottenham Hale.

Last year it was drastic. London Liverpool Street shut for eight days, and every Greater Anglia train on the West Anglia line ran to and from Stratford instead.

Overview

  • No trains on Friday 25 December, and most operators run nothing on Saturday 26 December.
  • Trains finish early on Christmas Eve and New Year’s Eve. Last-train times are published in late November or early December.
  • No Liverpool Street closure for the Harlow line is listed for Christmas 2026, but works can still be added.
  • Monday 21 to Wednesday 23 December, overnight: trains via Tottenham Hale are diverted via Seven Sisters.

Updated 5 November: National Rail now lists the Christmas works on the West Anglia line. There is no Liverpool Street closure among them. The overnight diversions on 21 to 23 December, the Boxing Day Stansted Express from Tottenham Hale and the 27 December and 3 January Sunday changes are below. Greater Anglia’s own Christmas timetable and last trains are still to come.

The works listed for the Harlow line

National Rail’s engineering works list, checked on 5 November, has these for Christmas and New Year on the line through Harlow:

When What changes
Mon 21 to Wed 23 Dec, overnight Between 23:20 and 05:00, trains that normally run via Tottenham Hale are retimed and run via Seven Sisters
Sat 26 Dec No Stansted Express between Liverpool Street and Tottenham Hale; a reduced, amended Stansted Express runs between Tottenham Hale and Stansted Airport
Sun 27 Dec, early and late Before 08:15 and after 23:59, trains that normally run via Tottenham Hale run via Seven Sisters
Sun 3 Jan, before 09:50 Stansted Express diverted via Tottenham Hale and Stratford, up to 10 minutes slower

On Boxing Day, tickets between Liverpool Street and Tottenham Hale are accepted on the Underground. The notice does not say which stations the Boxing Day Stansted Express calls at, so check the journey planner before relying on it from Harlow. (National Rail, 21 to 23 December; 26 December; 27 December; 3 January)

The Christmas works at Liverpool Street itself are for c2c, whose trains use Fenchurch Street instead on 5 and 6 December and 2 and 3 January. They do not touch Harlow trains. (National Rail, c2c 5 and 6 December; 2 and 3 January)

What National Rail has confirmed for 2026/27

National Rail’s Christmas and New Year 2026/27 page covers Thursday 24 December 2026 to Monday 4 January 2027. It says:

Date What National Rail says
Thursday 24 December Trains finish earlier than normal on many routes
Friday 25 December No National Rail services
Saturday 26 December Most operators run nothing; a very limited service from a few, details to be confirmed
Monday 28 December The Boxing Day bank holiday falls here this year; services to be confirmed
Thursday 31 December Earlier finishes on some routes
Friday 1 January Special late services on some London routes after midnight

It also says there will be “lots of planned essential engineering works” over the period, with full details of the major works to follow. On 20 October it named works at Birmingham New Street, London Paddington (Dolphin Junction, 27 December to 3 January) and London Waterloo (27 and 28 December). None of them affects Harlow. The West Anglia works listed since are in the table above.

What happened last Christmas

Network Rail announced its 2025 Anglia Christmas works on 20 October 2025. For Harlow the key points were:

  • Liverpool Street closed from Christmas Day to Thursday 1 January, eight days, for work on the station roof and drainage. It reopened to trains on Friday 2 January 2026.
  • From Saturday 27 December, West Anglia trains ran to and from Stratford, as did Stansted Express.
  • Stansted Express ran a revised service to and from Tottenham Hale on Boxing Day. No rail replacement buses ran anywhere on 25 or 26 December.
  • North of Harlow, there were no trains between Stansted Mountfitchet and Cambridge from 27 December to 4 January, for re-signalling, with replacement buses.

That roof work is now done. On 5 October Network Rail announced the completion of the two-year project, which replaced 11,000 square metres of glazing over platforms 1 to 10 and renewed the roof drainage. That removes last year’s main reason for shutting the station, but it does not rule out other Christmas works on the line. Last year’s plan was announced on 20 October; the 2026 one has not been published yet.

Buses

Arriva’s bank holiday page lists Herts and Essex bank holidays as Sunday services, but it had not yet added the Christmas dates on 25 September, and still had not on 20 October. We found no published Christmas or New Year bus times for Harlow yet.

Driving and parking

Council car parks in Harlow give the first hour free at 13 of 14 sites; tariffs are on our parking in Harlow page. Last year’s council Christmas information page said nothing about Christmas parking concessions, and none has been announced for 2026. Live road closures are on our Harlow roadworks page.

What is still to be confirmed

  • Greater Anglia’s own Christmas and New Year timetable, and whether any further West Anglia works are added to the list.
  • Christmas Eve last trains from Liverpool Street to Harlow (late November or early December).
  • Arriva’s Christmas and New Year bus times.

Normal journey times and fares are on our Harlow train times to London page.